Electrification strategy

Project Overview

A national infrastructure and civil engineering contractor engaged Actrify to assess its readiness for zero-emission projects and electrification. Increasing climate requirements in public tenders, financial incentives tied to CO₂ reduction targets, and the need for better digital control across project phases motivated a structured pre-study.

Actrify’s Contribution

Actrify conducted a targeted pre-study including process mapping, document review, and stakeholder interviews. The work covered existing digital tools and workflows across tendering, planning, and execution — resulting in a gap analysis, a target-state roadmap, and a conceptual description of a project-level digital twin.

Collaboration & Approach

The project was delivered in close cooperation with the client’s internal climate lead and project management team. Actrify led scoping, process documentation analysis, and structured workshops, drawing on specialists in electrification, energy systems, and digital simulation.

Outcome

The pre-study provided a clear decision basis for how the client should govern and support zero-emission and electrified projects going forward. Actrify identified concrete gaps between documented processes and actual practice, and outlined a prioritized roadmap — including digital twin concepts and AI-assisted tooling for tendering and project control.

Contact us

Oscar Sönnergren
Senior Energy Advisor
oscar.sonnergren@actrify.com
+46734474610

You might also be interested in:

EMS Evaluation project

EMS Evaluation project

Actrify evaluated strategic EMS pathways for a Nordic fast-charging network operator — covering technical alternatives, business impacts, and cybersecurity considerations, and delivering a structured decision basis for future implementation.

read more
Energy Analysis & Optimization Initiative

Energy Analysis & Optimization Initiative

Actrify conducted a targeted energy assessment for a national industrial service provider, identifying cost-saving opportunities at a key facility — delivered in close collaboration with the client’s local team and resulting in a structured decision basis for future energy optimization.

read more

Contact us

Fill in the form and we will come back to you!

11 + 2 =